1. List of Finished Projects
1 Construction of Al Qarara Infiltration Basin 489,030 IDB/GCC
2 Upgrading of Jomizit El Sabeel Sewage pumping station 378,838 UNICEF
3 Construction of  Wastewater Networks in Rafah Municipality area
Construction of Sewage pressure line from Sawarha PS - Zawida to Salah El Deen street.
Excavation, Shaping stormwater pond near KH WWTP over 16 dounms area to receive the storm water from Al Amal Infiltration basin – Khan younis
Upgrading of Water Carrier Line in Rafah (Tal El Sultan)
1,000,000 UNDP
4 Water main lines with connection and Fittings at Absan Al Kabera , rafah and Khanyounis. 800,000 JICA
5 Construction of pressure Pipeline from Manshia Pumping Station to Beit Lahia Wastewater Treatment Plant 266,000 Qatar chairty
6 Retention and Infiltration Basin in Al Amal Area 3,500,000 الهيئه العربية
7 Construction of Boundary Wall for Al Junina Storm Water Pond at Rafah. 195,720 PGF
8 WASTE WATER NETWORKS INAMER
Construction of Wastewater Network in Dair El Balah
3,200,000 EU/KfW
2. List of Ongoing Projects
1 Rafah Storm Water Detention Basin and Overflow Conveyance System to the Sea. 2,358,559 UNICEF
2 Construction of West Al-Nusirat Pumping Station; Wastewater Networks & Household Connections 749,995 ICRC
3 Al Berkah & Ma'an Reservoirs and Pumping Facilities - GAZ II 8,000,000 USAID
4 Nusirat& Atatrah Reservoirs and Pumping Facilities - GAZ II 8,000,000 USAID
5 Construction of Ground water Tank in Rafah-El Shabora.,3000 m3 at Al Burij water tank,  4000 m3 at Maghazi water tank, Deir El Balah water tank 17,000,000 USAID
6 Pressure pipeline form Wafia sewage pump station to Khan Younis WWTP.
Construction of Khan Younis WWTP effluent pipeline.
1,100,000 ICRC
7 Construction of Al Shoka Water Tank, Booster Station and Carrier Water lines at Al Shoka area in Rafah - Gaza Strip. 1,000,000 Anera
8 Construction of Al Fukhari Water Tank, Booster Station and Carrier Water lines at Al Fukhari area in Khan Younis - Gaza Strip. 1,000,000 Anera
9 Construction of Al Zahra Sewage Pumping station, wastewater networks & household connections. 718,310 UNICEF
10 Construction of West Al-Nusirat Pumping Station; Wastewater Networks & Household Connections 749,995 ICRC
3. List of Proposed Projects
1 Construction wastewater pumping station  and wastewater networks at Kherbet AL Adass area – Rafah , and Upgrading the existing WWTP  – Rafah  8,000,000  
2 Construction wastewater networks  to serve Al Zaytoon area in Beit Hanon  500,000  
3 Construction of the Wastewater system for Eastern Valliges including the Pump stations, Networks, presure lines in parallel with construction of the WWTP east of Khan younis which will start soon . 7,000,000  
4 Construction of Storm water pressure pipeline and infiltration basin at Rafah_Junina 2,000,000  
5 Cleaning the route of Wadi Gaza and Wadi Beit Hanon from all sewage (since the Wadi GWWTP is in operation ) ,solid wastes ,debris , sludge etc 3,000,000  
6 Construction of wastewater and Storm Water System For Wadi Al Salqa 6,000,000  
7 Replacement of sewage network at Tal El Sultan - Rafah. 700,000  
8 Construction of Storm water pipelines at UNDP roundabout and Abu Baker street- Rafah. 500,000  
9 Construction stormwater box culvert from Wadi Al qeshash to Wadi Gaza 1,000,000  
10 Develop Wadi Salqa in order to mitigate the flood and convert it to recreation area   6,000,000  
11 Wastewater Network at Abu Mohadi area in Nusirat and Zahra City in the middle area. 1,000,000  
12 Replacement of Pressure Line of Al Bassa  Sewerage Pump Station – Deir Al Balah 800,000  

 